The challenge
For a beach reinforcement project at Wangerooge, on the Wadden Sea, a client needed support in the controlled and efficient processing of 90,000 m³ of sand.
The circumstances were challenging: limited space, changing tides, high winds and a complex installation including a DOP pump, jet pump, booster, frequency controlled winches, spud poles, GPS systems and a variable piping system.
A delayed start immediately put pressure on the schedule.
Our approach
We provided on-site technical supervision throughout the project. Our efforts focused on:
By being continuously present, we were able to intervene immediately in cases such as incorrect start positions, restricted dredge width or incorrect DGPS display.
The result